| 11/17/2025 |
Corrective actions provided by the operator: the leaking suction valve was fixed to prevent compressor to pressure up. Rupture disc operated by design to relive high pressure. |
| 11/17/2025 |
Primary Equipment identified by the operator (Gas Compressor Station, with additional details: Compressors at 32-7 went shut down on high discharge pressure, the suction control valve closed but leaked by causing rupture disc to pop off.) |
| 11/17/2025 |
Steps taken to prevent waste provided by the operator: Mechanic found the issue and shut in manual block valve to stop the release |
| 11/17/2025 |
Incident updated by the operator, upon the submission of a amendment for venting of natural gas report. |
| 11/17/2025 |
The (11/17/2025, C-129A) application [527046] was assigned to this incident. |
| 11/07/2025 |
The (11/07/2025, NOMVF) application [524541] was assigned to this incident. |
| 11/07/2025 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 11/06/2025 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |