| 02/03/2026 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 02/03/2026 |
The (02/03/2026, C-129A) application [549561] was assigned to this incident. |
| 01/15/2026 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 01/15/2026 |
The (01/15/2026, C-129A) application [543596] was assigned to this incident. |
| 01/06/2026 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 01/06/2026 |
The (01/06/2026, C-129A) application [540566] was assigned to this incident. |
| 01/05/2026 |
The (01/05/2026, C-129) application [540033] was assigned to this incident. |
| 01/05/2026 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 01/05/2026 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 01/05/2026 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 01/03/2026 |
The flaring of natural gas discovered by the operator. |