[C-103] Sub. Release After P&A (C-103Q) Application

Submission Information
Submission ID: 241218   Districts: Artesia
Operator: [372098] MARATHON OIL PERMIAN LLC   Counties: Eddy
Description: MARATHON OIL PERMIAN LLC [372098]
, HARROUN COM #001
, 30-015-23520
 
Status: REJECTED  
Status Date: 07/27/2023  
References (1):
30-015-23520 ... (click-to-expand) (click-to-collapse)
Forms
Attachments:
Marker Photographs
Questions

Subsequent Report of: Location Ready For OCD Inspection After P&A

Was this the last remaining or only well on the location
Are there any abandoned pipelines that are going to remain on the location
Is there any production equipment or structure (not including steel marker, poured onsite concrete bases, or pipelines) that is going to remain on the location
If any production equipment or structure is to remain on the location, please specify

Site Evaluation

Please answer all the questions in this group.
Have all the required pits been remediated in compliance with OCD rules and the terms of the Operator’s pit permit and closure plan
Have the rat hole and cellar been filled and leveled
Have the cathodic protection holes been properly abandoned
Has a steel marker, at least 4 inches in diameter and at least 4 feet above ground level, been set in concrete
The (concrete-set) steel marker shows:
Must attach marker photograph(s). *
THE OPERATOR NAME, LEASE NAME AND WELL NUMBER AND LOCATION, INCLUDING UNIT LETTER, SECTION, TOWNSHIP AND RANGE, SHALL BE WELDED, STAMPED OR OTHERWISE PERMANENTLY ENGRAVED INTO THE MARKER’S METAL.
Has the location been leveled as nearly as possible to original ground contour
Have all the required pipelines and other production equipment been cleared
Has all the required junk and trash been cleared from the location
Have all the required anchors, dead men, tie downs and risers have been cut off at least two feet below ground level
Have all the required metal bolts and other materials have been removed
Poured onsite concrete bases do not have to be removed.
Have all the the required portable bases been removed
Have all other environmental concerns have been addressed as per OCD rules
If any environmental concerns remain on the location, please specify
* Proof of the site marker (photograph) is required.
Please submit any other site photographs that would assist in documenting the above answers, site features, addtional concerns, or other nearby / remaing structures and equipment.

Abandoned Pipelines

Only need to provide answers in this group, if any pipelines have been abandoned (in accordance with 19.15.35.10 NMAC).
Have all fluids have been removed from any abandoned pipelines
Have all abandoned pipelines been confirmed to NOT contain additional regulated NORM, other than that which accumulated under normal operation
Have all accessible points of abandoned pipelines been permanently capped

Last Remaining or Only Well on the Location

Please answer all questions that apply in this group, specifically if there is no longer going to be any well or facility remaining at this location.
Have all electrical service poles and lines been removed from the location
Is there any electrical utility distribution infrastructure that is remaining on the location
Have all the battery and pit location(s) have been remediated in compliance with OCD rules and the terms of the Operator’s pit permit and closure plan
Have all the retrievable pipelines, production equipment been removed from the location
Has all the junk and trash been removed from the location
Acknowledgments
I hereby certify that all the work has been completed for this location and the site is ready for an OCD scheduled inspection.
Comments
No comments found for this submission.
Conditions
No conditions found for this submission.
Reasons
Summary:
gcordero (7/27/2023), Not Ready for Release. Meter run and meter house not removed.