OCD Permitting

[228937] MATADOR PRODUCTION COMPANY

General Information
One Lincoln Centre
5400 LBJ Freeway, Ste 1500
Dallas, TX 75240

U.S.A.

972-371-5200


Well Operator
Facilities (487), Pits (667), Tanks (6), Wells (1,791)
Contacts

Central Contact

Facilities (1)
Brett Jennings
Regulatory Analyst
Brett.Jennings@matadorresources.com

972-629-2160

Brett Jennings


Hobbs Contact

Facilities (270), Pits (435), Tanks (6), Wells (1,198)
Casey Snow
Mgr. Regulatory, Environmental & Safety
csnow@matadorresources.com

972-371-5200
817-694-2136
Casey Snow


Artesia Contact

Facilities (216), Pits (232), Wells (593)
Casey Snow
Mgr. Regulatory, Environmental & Safety
csnow@matadorresources.com

972-371-5200
817-694-2136
Casey Snow


Aztec Contact










Santa Fe Contact









Natural Gas Capture Targets
Target Gas Capture Rate (%) Certified Gas Capture Rate (%) Notes
Upstream
South
2022 98.00 98.69
2023 98.00 99.87
2024 98.00 99.73
2025 98.00 -
2026 98.00 -

Baseline natural gas capture rates are based on the operator’s fourth quarter 2021 and first quarter 2022 quarterly reports.

Blanket Bond(s)
[52] ARCH INSURANCE COMPANY
Surety
$250,000.00
Blanket Bond for Temporarily Abandoned Wells
[52] ARCH INSURANCE COMPANY
Surety
$1,000,000.00
Single Well Bonds
No Single Well Bonds
Blanket Bond for Surface Waste Facilities
No Active Blanket Bond for Surface Waste Facilities
Facility Bonds
No Single Facility Bonds
Click to go back to top of page