OCD Permitting

[372043] TAP ROCK OPERATING, LLC

General Information
523 Park Point Drive
Suite 200
Golden, CO 80401

U.S.A.

720-772-5093
Well Operator
Facilities (25), Pits (156), Wells (204)
Contacts

Central Contact

Bill Ramsey
Sr. Environmental & Regulatory Specialist
bramsey@taprk.com

720-238-2787
720-238-2787
Bill Ramsey


Hobbs Contact

Facilities (21), Pits (155), Wells (170)
Paul Weddle

pweddle@taprk.com

720-233-1280
720-233-1280
Paul Weddle


Artesia Contact

Facilities (4), Pits (1), Wells (34)
Paul Weddle

pweddle@taprk.com

720-233-1280
720-233-1280
Paul Weddle


Aztec Contact










Santa Fe Contact









Natural Gas Capture Targets
Target Gas Capture Rate (%) Certified Gas Capture Rate (%) Notes
Upstream
South (Baseline Gas Capture Rate: 98.00%; Minimum Required Annual Gas Capture Increase: 0.00%)
2022 98.00 99.15
2023 98.00 99.03
2024 98.00 -
2025 98.00 -
2026 98.00 -

Baseline natural gas capture rates are based on the operator’s fourth quarter 2021 and first quarter 2022 quarterly reports.

Blanket Bond(s)
[311] Endurance Assurance Corporation
Surety
$250,000.00
Blanket Bond for Temporarily Abandoned Wells
[311] Endurance Assurance Corporation
Surety
$150,000.00
Single Well Bonds
No Single Well Bonds
Blanket Bond for Surface Waste Facilities
No Active Blanket Bond for Surface Waste Facilities
Facility Bonds
No Single Facility Bonds
Click to go back to top of page