FAB1805958241 REMUDA RECYCLING FACILITY @ H-25-23S-29E 0N 0E

General Facility Information
[5380] XTO ENERGY, INC
Active
Request to Open Accepted, Pending submission of Monthly/Annual reporting from the operator as required
Recycling Facility - (RFL)

Surface Location: H-25-23S-29ELot: 0 FNL 0 FEL
Lat/Long:32.271772,-103.932447 NAD83

Artesia
State
Eddy (15)


Ground Water (GW) Details

0
0
No



Notes



Facility Dates

Type Action Effective Received Denied Approved
Responsible Party Change 02/09/2023 02/09/2023
Commencement of Operations Notice 02/28/2018 02/28/2018
Site Registration 02/28/2018 02/28/2018

Events

No events Found

History
Effective On Name Operator Status Effective Until
02/09/2023 REMUDA RECYCLING FACILITY [373075] XTO PERMIAN OPERATING LLC.
02/28/2018 REMUDA RECYCLING FACILITY [5380] XTO ENERGY, INC 02/09/2023

Pits & Containments
Id Name Rule Status (Capacity) Type Registration
Inspection
Before *
Earliest Effective
Commencement
Last Effective
Cessation
Inspection
After *
Closure
Report
Reclamation
Report
Restoration
Complete
YCON1805949209 1900 AROA RCON @ FAB1805958241
34
Active
(375000 bbl) RCON
02/28/2018 02/28/2018
YCON1805949210 1900 AROA RCON @ FAB1805958241
34
Active
(375000 bbl) RCON
02/28/2018 02/28/2018




Recycled Liquid Oil Field Waste

The recycled liquid oil field waste volumes are sourced from recycled liquid oil field waste reports (C-148) submissions.

Collapse All Recycled Liquid Oil Field Waste 11/2025 05/2026
Operational Capacity (bbl) Opening Level (bbl) Produced Water Received (bbl) Other Fluids Received (bbl) Oil Skimmed (bbl) Volume Leaving Facility (bbl) Closing Level (bbl)
2025
YCON1805949209 (RCON)
November 375,000 0 38,971 Beginning pit volume 0 0 38,971
December 375,000 38,971 0 0 0 0 38,971
Structure Total: 0 38,971 0 0
YCON1805949210 (RCON)
November 375,000 266,718 18,673 Beginning pit volume 0 165,000 120,391
December 375,000 120,391 0 0 0 0 120,391
Structure Total: 266,718 18,673 0 165,000
Annual Total: 266,718 57,644 0 165,000
2026
YCON1805949209 (RCON)
January 375,000 38,971 220,959 0 0 0 259,930
February 375,000 259,930 0 105,613 brackish 0 0 365,543
March 375,000 365,543 0 0 0 255,555 109,988
April 375,000 109,988 0 0 0 0 109,988
May 375,000 109,988 0 0 0 106,910 3,078
Structure Total: 220,959 105,613 0 362,465
YCON1805949210 (RCON)
January 375,000 120,391 0 0 0 95,391 25,000
February 375,000 25,000 0 0 0 0 25,000
March 375,000 25,000 0 0 0 0 25,000
April 375,000 25,000 0 0 0 0 25,000
May 375,000 25,000 71,625 0 0 0 96,625
Structure Total: 71,625 0 0 95,391
Annual Total: 292,584 105,613 0 457,856
Grand Total: 559,302 163,257 0 622,856

Orders

2RF-126-0

images

Applicant:[5380] XTO ENERGY, INC

Contact:Stephanie Rabadue
Reviewer:LWB
Approved By:
Issuing Office:Artesia

Processing Dates

Received:02/28/2018
Approved:02/28/2018
Expiration:
Ordered:02/28/2018
Denied:
Cancelled:


Inspections No Inspections Found

Financial Assurance
Effective Base Balance Issuer Cash/Surety Bond Type Cancellation Date
Requests to release bonds must be submitted in writing. You may send an e-mail to OCD.AdminComp@emnrd.nm.gov.

Click to go back to top of page