2021 |
|
October (first required quarterly report) |
| Emergency |
0 |
6,233 |
6,233 |
Power generation on lease |
488 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
49 |
49 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
124,821 |
124,821 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
October (first required quarterly report)
|
0 |
131,103 |
131,103 |
|
488 |
|
Annual Total:
2021
|
0 |
131,103 |
131,103 |
|
488 |
|
2022 |
|
January (second required quarterly report) |
| Emergency |
0 |
3,201 |
3,201 |
Power generation on lease |
688 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
32 |
32 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
70,986 |
70,986 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
January (second required quarterly report)
|
0 |
74,219 |
74,219 |
|
688 |
|
April |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
240 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
8 |
8 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
April
|
0 |
8 |
8 |
|
240 |
|
May |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
248 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
8 |
8 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
May
|
0 |
8 |
8 |
|
248 |
|
June |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
240 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
7 |
7 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
June
|
0 |
7 |
7 |
|
240 |
|
July |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
248 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
6 |
6 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
July
|
0 |
6 |
6 |
|
248 |
|
August |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
7 |
7 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
August
|
0 |
7 |
7 |
|
248 |
|
September |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
5 |
5 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
September
|
0 |
5 |
5 |
|
240 |
|
October |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
6 |
6 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
October
|
0 |
6 |
6 |
|
248 |
|
November |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
7 |
7 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
November
|
0 |
7 |
7 |
|
240 |
|
December |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
6 |
6 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
December
|
0 |
6 |
6 |
|
248 |
|
Annual Total:
2022
|
0 |
74,279 |
74,279 |
|
2,888 |
|
2023 |
|
January |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
6 |
6 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
January
|
0 |
6 |
6 |
|
248 |
|
February |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
4 |
4 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
221 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
February
|
0 |
4 |
4 |
|
221 |
|
March |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
5 |
5 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
March
|
0 |
5 |
5 |
|
248 |
|
April |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
23 |
23 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
April
|
0 |
23 |
23 |
|
240 |
|
May |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
22 |
22 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
208 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
May
|
0 |
22 |
22 |
|
208 |
|
June |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
25 |
25 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
56 |
|
56 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
232 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
49 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
June
|
56 |
25 |
81 |
|
281 |
|
July |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
27 |
27 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
60 |
|
60 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
July
|
60 |
27 |
87 |
|
300 |
|
August |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
22 |
22 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
60 |
|
60 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
August
|
60 |
22 |
82 |
|
300 |
|
September |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
23 |
23 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
September
|
0 |
23 |
23 |
|
290 |
|
October |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
18 |
18 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
216 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
October
|
0 |
18 |
18 |
|
261 |
|
November |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
24 |
24 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
November
|
0 |
24 |
24 |
|
290 |
|
December |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
22 |
22 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
December
|
0 |
22 |
22 |
|
300 |
|
Annual Total:
2023
|
176 |
221 |
397 |
|
3,187 |
|
2024 |
|
January |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
15 |
15 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
January
|
0 |
15 |
15 |
|
300 |
|
February |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
18 |
18 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
232 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
48 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
February
|
0 |
18 |
18 |
|
280 |
|
March |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
20 |
20 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
March
|
0 |
20 |
20 |
|
290 |
|
April |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
21 |
21 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
April
|
0 |
21 |
21 |
|
290 |
|
May |
| Emergency |
0 |
19 |
19 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
14 |
14 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
May
|
0 |
33 |
33 |
|
300 |
|
June |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
19 |
19 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
June
|
0 |
19 |
19 |
|
290 |
|
July |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
20 |
20 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
July
|
0 |
20 |
20 |
|
300 |
|
August |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
16 |
16 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
August
|
0 |
16 |
16 |
|
300 |
|
September |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
17 |
17 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
232 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
49 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
September
|
0 |
17 |
17 |
|
281 |
|
October |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
12 |
12 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
184 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
39 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
October
|
0 |
12 |
12 |
|
223 |
|
November |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
18 |
18 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
November
|
0 |
18 |
18 |
|
290 |
|
December |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
16 |
16 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
December
|
0 |
16 |
16 |
|
300 |
|
Annual Total:
2024
|
0 |
225 |
225 |
|
3,444 |
|
2025 |
|
January |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
12 |
12 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
53 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
January
|
0 |
12 |
12 |
|
301 |
|
February |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
16 |
16 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
224 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
47 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
February
|
0 |
16 |
16 |
|
271 |
|
March |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
13 |
13 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
March
|
0 |
13 |
13 |
|
300 |
|
April |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
13 |
13 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
April
|
0 |
13 |
13 |
|
290 |
|
May |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
18 |
18 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
May
|
0 |
18 |
18 |
|
300 |
|
June |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
11 |
11 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
192 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
40 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
June
|
0 |
11 |
11 |
|
232 |
|
July |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
12 |
12 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
176 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
37 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
July
|
0 |
12 |
12 |
|
213 |
|
August |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
6 |
6 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
August
|
0 |
6 |
6 |
|
0 |
|
September |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
6 |
6 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
September
|
0 |
6 |
6 |
|
0 |
|
October |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
11 |
11 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
October
|
0 |
11 |
11 |
|
300 |
|
November |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
7 |
7 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
240 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
50 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
November
|
0 |
7 |
7 |
|
290 |
|
December |
| Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
| Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
| Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
| Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
| Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
| Storage Tanks |
0 |
13 |
13 |
Reinjection for temporary storage |
0 |
| Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
| Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
| Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
248 |
| Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
52 |
| Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
| Other Surface Waste |
0 |
0 |
0 |
|
|
| Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
|
Report Total:
December
|
0 |
13 |
13 |
|
300 |
|
Annual Total:
2025
|
0 |
138 |
138 |
|
2,797 |
| Grand Total: |
176 |
205,966 |
206,142 |
|
12,804 |