2021 |
|
October (first required quarterly report) |
| Gas Gathered |
9,328,253 |
|
|
|
|
| Beneficial Use |
|
|
|
|
25,697 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
34 |
1,052 |
1,086 |
|
| Gathering Pipeline Blowdown and Purging |
|
164 |
0 |
164 |
|
| Gathering Pipeline Pigging |
|
74 |
0 |
74 |
|
| Storage Tanks |
|
0 |
1,013 |
1,013 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
1,988 |
|
1,988 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
October (first required quarterly report)
|
9,328,253 |
2,260 |
2,065 |
4,325 |
25,697 |
|
Annual Total:
2021
|
9,328,253 |
2,260 |
2,065 |
4,325 |
25,697 |
|
2022 |
|
January (second required quarterly report) |
| Gas Gathered |
10,239,963 |
|
|
|
|
| Beneficial Use |
|
|
|
|
20,006 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
23 |
264 |
287 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
65 |
0 |
65 |
|
| Storage Tanks |
|
0 |
1,355 |
1,355 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
2,031 |
|
2,031 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
January (second required quarterly report)
|
10,239,963 |
2,119 |
1,619 |
3,738 |
20,006 |
|
April |
| Gas Gathered |
3,882,973 |
|
|
|
|
| Beneficial Use |
|
|
|
|
53,595 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
23 |
951 |
974 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
19 |
0 |
19 |
|
| Storage Tanks |
|
0 |
3,828 |
3,828 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
648 |
|
648 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
April
|
3,882,973 |
690 |
4,779 |
5,469 |
53,595 |
|
May |
| Gas Gathered |
4,061,738 |
|
|
|
|
| Beneficial Use |
|
|
|
|
55,430 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
14 |
1,143 |
1,157 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
3 |
0 |
3 |
|
| Storage Tanks |
|
0 |
2,484 |
2,484 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
670 |
|
670 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
May
|
4,061,738 |
687 |
3,627 |
4,314 |
55,430 |
|
June |
| Gas Gathered |
5,249,391 |
|
|
|
|
| Beneficial Use |
|
|
|
|
85,709 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
24 |
1,438 |
1,462 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
13 |
0 |
13 |
|
| Storage Tanks |
|
0 |
2,239 |
2,239 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
648 |
|
648 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
June
|
5,249,391 |
685 |
3,677 |
4,362 |
85,709 |
|
July |
| Gas Gathered |
5,793,795 |
|
|
|
|
| Beneficial Use |
|
|
|
|
95,937 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
4 |
691 |
695 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
7 |
0 |
7 |
|
| Storage Tanks |
|
0 |
55 |
55 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
670 |
|
670 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
July
|
5,793,795 |
681 |
746 |
1,427 |
95,937 |
|
August |
| Gas Gathered |
5,986,527 |
|
|
|
|
| Beneficial Use |
|
|
|
|
85,095 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
21 |
836 |
857 |
|
| Gathering Pipeline Blowdown and Purging |
|
139 |
0 |
139 |
|
| Gathering Pipeline Pigging |
|
2 |
0 |
2 |
|
| Storage Tanks |
|
0 |
419 |
419 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
670 |
|
670 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
August
|
5,986,527 |
832 |
1,255 |
2,087 |
85,095 |
|
September |
| Gas Gathered |
6,090,651 |
|
|
|
|
| Beneficial Use |
|
|
|
|
89,614 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
10 |
653 |
663 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
8 |
0 |
8 |
|
| Storage Tanks |
|
1 |
292 |
293 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
648 |
|
648 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
September
|
6,090,651 |
667 |
945 |
1,612 |
89,614 |
|
October |
| Gas Gathered |
6,144,931 |
|
|
|
|
| Beneficial Use |
|
|
|
|
95,295 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
5 |
1,077 |
1,082 |
|
| Gathering Pipeline Blowdown and Purging |
|
29 |
0 |
29 |
|
| Gathering Pipeline Pigging |
|
9 |
0 |
9 |
|
| Storage Tanks |
|
1 |
120 |
121 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
670 |
|
670 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
October
|
6,144,931 |
714 |
1,197 |
1,911 |
95,295 |
|
November |
| Gas Gathered |
5,843,685 |
|
|
|
|
| Beneficial Use |
|
|
|
|
96,468 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
12 |
923 |
935 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
12 |
0 |
12 |
|
| Storage Tanks |
|
1 |
580 |
581 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
648 |
|
648 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
November
|
5,843,685 |
673 |
1,503 |
2,176 |
96,468 |
|
December |
| Gas Gathered |
5,769,032 |
|
|
|
|
| Beneficial Use |
|
|
|
|
90,996 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
409 |
0 |
409 |
|
| Routine Repair and Maintenance |
|
10 |
836 |
846 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
2 |
0 |
2 |
|
| Storage Tanks |
|
0 |
677 |
677 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
670 |
|
670 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
December
|
5,769,032 |
1,091 |
1,513 |
2,604 |
90,996 |
|
Annual Total:
2022
|
59,062,686 |
8,839 |
20,861 |
29,700 |
768,145 |
|
2023 |
|
January |
| Gas Gathered |
5,815,256 |
|
|
|
|
| Beneficial Use |
|
|
|
|
89,481 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
0 |
523 |
523 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
2 |
0 |
2 |
|
| Storage Tanks |
|
0 |
1,123 |
1,123 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
670 |
|
670 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
January
|
5,815,256 |
672 |
1,646 |
2,318 |
89,481 |
|
February |
| Gas Gathered |
5,428,285 |
|
|
|
|
| Beneficial Use |
|
|
|
|
86,970 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
89 |
2,541 |
2,630 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
1 |
0 |
1 |
|
| Storage Tanks |
|
0 |
52 |
52 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
605 |
|
605 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
February
|
5,428,285 |
695 |
2,593 |
3,288 |
86,970 |
|
March |
| Gas Gathered |
5,873,842 |
|
|
|
|
| Beneficial Use |
|
|
|
|
100,279 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
2 |
91 |
93 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
2 |
0 |
2 |
|
| Storage Tanks |
|
0 |
139 |
139 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
670 |
|
670 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
March
|
5,873,842 |
674 |
230 |
904 |
100,279 |
|
April |
| Gas Gathered |
5,523,572 |
|
|
|
|
| Beneficial Use |
|
|
|
|
93,418 |
| Emergency |
|
1,217 |
0 |
1,217 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
6 |
47 |
53 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
3 |
0 |
3 |
|
| Storage Tanks |
|
0 |
50 |
50 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
648 |
|
648 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
April
|
5,523,572 |
1,874 |
97 |
1,971 |
93,418 |
|
May |
| Gas Gathered |
5,592,950 |
|
|
|
|
| Beneficial Use |
|
|
|
|
102,345 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
12 |
106 |
118 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
2 |
0 |
2 |
|
| Storage Tanks |
|
0 |
55 |
55 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
May
|
5,592,950 |
403 |
161 |
564 |
102,345 |
|
June |
| Gas Gathered |
5,715,024 |
|
|
|
|
| Beneficial Use |
|
|
|
|
96,188 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
5 |
227 |
232 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
5 |
0 |
5 |
|
| Storage Tanks |
|
0 |
112 |
112 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
June
|
5,715,024 |
386 |
339 |
725 |
96,188 |
|
July |
| Gas Gathered |
5,487,896 |
|
|
|
|
| Beneficial Use |
|
|
|
|
95,563 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
4 |
122 |
126 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
3 |
0 |
3 |
|
| Storage Tanks |
|
0 |
170 |
170 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
July
|
5,487,896 |
396 |
292 |
688 |
95,563 |
|
August |
| Gas Gathered |
5,266,071 |
|
|
|
|
| Beneficial Use |
|
|
|
|
93,778 |
| Emergency |
|
45,349 |
0 |
45,349 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
12 |
59 |
71 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
9 |
0 |
9 |
|
| Storage Tanks |
|
0 |
152 |
152 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
August
|
5,266,071 |
45,759 |
211 |
45,970 |
93,778 |
|
September |
| Gas Gathered |
4,844,934 |
|
|
|
|
| Beneficial Use |
|
|
|
|
74,898 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
11 |
67 |
78 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
5 |
0 |
5 |
|
| Storage Tanks |
|
0 |
86 |
86 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
September
|
4,844,934 |
392 |
153 |
545 |
74,898 |
|
October |
| Gas Gathered |
5,091,001 |
|
|
|
|
| Beneficial Use |
|
|
|
|
111,833 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
1 |
94 |
95 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
3 |
0 |
3 |
|
| Storage Tanks |
|
0 |
78 |
78 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
October
|
5,091,001 |
393 |
172 |
565 |
111,833 |
|
November |
| Gas Gathered |
5,310,568 |
|
|
|
|
| Beneficial Use |
|
|
|
|
127,704 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
3 |
71 |
74 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
0 |
0 |
0 |
|
| Storage Tanks |
|
0 |
69 |
69 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
November
|
5,310,568 |
379 |
140 |
519 |
127,704 |
|
December |
| Gas Gathered |
5,361,654 |
|
|
|
|
| Beneficial Use |
|
|
|
|
134,674 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
8 |
136 |
144 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
2 |
0 |
2 |
|
| Storage Tanks |
|
0 |
27 |
27 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
December
|
5,361,654 |
399 |
163 |
562 |
134,674 |
|
Annual Total:
2023
|
65,311,053 |
52,422 |
6,197 |
58,619 |
1,207,131 |
|
2024 |
|
January |
| Gas Gathered |
4,779,951 |
|
|
|
|
| Beneficial Use |
|
|
|
|
122,337 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
0 |
144 |
144 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
3 |
0 |
3 |
|
| Storage Tanks |
|
0 |
55 |
55 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
January
|
4,779,951 |
392 |
199 |
591 |
122,337 |
|
February |
| Gas Gathered |
4,878,785 |
|
|
|
|
| Beneficial Use |
|
|
|
|
123,197 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
4 |
81 |
85 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
1 |
0 |
1 |
|
| Storage Tanks |
|
0 |
35 |
35 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
364 |
|
364 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
February
|
4,878,785 |
369 |
116 |
485 |
123,197 |
|
March |
| Gas Gathered |
5,015,398 |
|
|
|
|
| Beneficial Use |
|
|
|
|
122,693 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
8 |
97 |
105 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
0 |
0 |
0 |
|
| Storage Tanks |
|
0 |
108 |
108 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
March
|
5,015,398 |
397 |
205 |
602 |
122,693 |
|
April |
| Gas Gathered |
4,685,627 |
|
|
|
|
| Beneficial Use |
|
|
|
|
116,116 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
4 |
153 |
157 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
3 |
0 |
3 |
|
| Storage Tanks |
|
0 |
53 |
53 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
April
|
4,685,627 |
383 |
206 |
589 |
116,116 |
|
May |
| Gas Gathered |
4,506,658 |
|
|
|
|
| Beneficial Use |
|
|
|
|
116,252 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
0 |
139 |
139 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
4 |
0 |
4 |
|
| Storage Tanks |
|
0 |
157 |
157 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
May
|
4,506,658 |
393 |
296 |
689 |
116,252 |
|
June |
| Gas Gathered |
4,338,840 |
|
|
|
|
| Beneficial Use |
|
|
|
|
115,181 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
11 |
180 |
191 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
0 |
0 |
0 |
|
| Storage Tanks |
|
0 |
297 |
297 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
June
|
4,338,840 |
387 |
477 |
864 |
115,181 |
|
July |
| Gas Gathered |
4,791,965 |
|
|
|
|
| Beneficial Use |
|
|
|
|
121,618 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
5 |
180 |
185 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
15 |
0 |
15 |
|
| Storage Tanks |
|
0 |
15 |
15 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
July
|
4,791,965 |
409 |
195 |
604 |
121,618 |
|
August |
| Gas Gathered |
4,594,248 |
|
|
|
|
| Beneficial Use |
|
|
|
|
125,204 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
7 |
336 |
343 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
1 |
0 |
1 |
|
| Storage Tanks |
|
0 |
39 |
39 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
August
|
4,594,248 |
397 |
375 |
772 |
125,204 |
|
September |
| Gas Gathered |
4,803,167 |
|
|
|
|
| Beneficial Use |
|
|
|
|
130,551 |
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
7 |
336 |
343 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
1 |
0 |
1 |
|
| Storage Tanks |
|
0 |
1,796 |
1,796 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
September
|
4,803,167 |
384 |
2,132 |
2,516 |
130,551 |
|
October |
| Beneficial Use |
|
|
|
|
123,203 |
| Gas Gathered |
4,323,824 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
2 |
208 |
210 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
1 |
0 |
1 |
|
| Storage Tanks |
|
0 |
3,065 |
3,065 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
October
|
4,323,824 |
392 |
3,273 |
3,665 |
123,203 |
|
November |
| Beneficial Use |
|
|
|
|
116,650 |
| Gas Gathered |
3,779,847 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
41 |
394 |
435 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
3 |
0 |
3 |
|
| Storage Tanks |
|
0 |
2,733 |
2,733 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
November
|
3,779,847 |
420 |
3,127 |
3,547 |
116,650 |
|
December |
| Beneficial Use |
|
|
|
|
130,760 |
| Gas Gathered |
4,676,868 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
10 |
393 |
403 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
0 |
0 |
0 |
|
| Storage Tanks |
|
0 |
9,057 |
9,057 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
December
|
4,676,868 |
399 |
9,450 |
9,849 |
130,760 |
|
Annual Total:
2024
|
55,175,178 |
4,722 |
20,051 |
24,773 |
1,463,762 |
|
2025 |
|
January |
| Beneficial Use |
|
|
|
|
128,295 |
| Gas Gathered |
4,791,584 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
16 |
2,180 |
2,196 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
110 |
0 |
110 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
January
|
4,791,584 |
515 |
2,180 |
2,695 |
128,295 |
|
February |
| Beneficial Use |
|
|
|
|
113,541 |
| Gas Gathered |
4,501,749 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
13 |
549 |
562 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
122 |
0 |
122 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
351 |
|
351 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
February
|
4,501,749 |
486 |
549 |
1,035 |
113,541 |
|
March |
| Beneficial Use |
|
|
|
|
117,884 |
| Gas Gathered |
4,971,622 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
5 |
165 |
170 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
278 |
0 |
278 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
March
|
4,971,622 |
672 |
165 |
837 |
117,884 |
|
April |
| Beneficial Use |
|
|
|
|
108,561 |
| Gas Gathered |
4,521,775 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
8 |
469 |
477 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
246 |
0 |
246 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
April
|
4,521,775 |
630 |
469 |
1,099 |
108,561 |
|
May |
| Beneficial Use |
|
|
|
|
109,501 |
| Gas Gathered |
4,817,757 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
17 |
50 |
67 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
251 |
0 |
251 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
May
|
4,817,757 |
657 |
50 |
707 |
109,501 |
|
June |
| Beneficial Use |
|
|
|
|
103,856 |
| Gas Gathered |
4,530,831 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
31 |
281 |
312 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
198 |
0 |
198 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
June
|
4,530,831 |
605 |
281 |
886 |
103,856 |
|
July |
| Beneficial Use |
|
|
|
|
104,274 |
| Gas Gathered |
3,724,844 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
34 |
79 |
113 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
153 |
0 |
153 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
July
|
3,724,844 |
576 |
79 |
655 |
104,274 |
|
August |
| Beneficial Use |
|
|
|
|
93,067 |
| Gas Gathered |
4,680,852 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
34 |
89 |
123 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
73 |
0 |
73 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
August
|
4,680,852 |
496 |
89 |
585 |
93,067 |
|
September |
| Beneficial Use |
|
|
|
|
126,585 |
| Gas Gathered |
4,884,200 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
30 |
89 |
119 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
1 |
0 |
1 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
376 |
|
376 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
September
|
4,884,200 |
407 |
89 |
496 |
126,585 |
|
October |
| Beneficial Use |
|
|
|
|
92,695 |
| Gas Gathered |
3,930,197 |
|
|
|
|
| Emergency |
|
0 |
0 |
0 |
|
| Non-Scheduled Maintenance or Malfunction |
|
0 |
0 |
0 |
|
| Routine Repair and Maintenance |
|
26 |
158 |
184 |
|
| Gathering Pipeline Blowdown and Purging |
|
0 |
0 |
0 |
|
| Gathering Pipeline Pigging |
|
282 |
0 |
282 |
|
| Storage Tanks |
|
0 |
0 |
0 |
|
| Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
|
389 |
|
389 |
|
| Improperly Closed or Maintained Thief Hatches |
|
0 |
|
0 |
|
| Other Surface Waste |
|
0 |
0 |
0 |
|
|
Report Total:
October
|
3,930,197 |
697 |
158 |
855 |
92,695 |
|
Annual Total:
2025
|
45,355,411 |
5,741 |
4,109 |
9,850 |
1,098,259 |
| Grand Total:
|
234,232,581 |
73,984 |
53,283 |
127,267 |
4,562,994 |