2021 |
October (first required quarterly report) |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
1,463 |
1,463 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
80 |
|
80 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
October (first required quarterly report)
|
80 |
1,463 |
1,543 |
|
0 |
Annual Total:
2021
|
80 |
1,463 |
1,543 |
|
0 |
2022 |
January (second required quarterly report) |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
1,298 |
1,298 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
26 |
|
26 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
January (second required quarterly report)
|
26 |
1,298 |
1,324 |
|
0 |
April |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
142 |
142 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
April
|
9 |
142 |
151 |
|
0 |
May |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
43 |
43 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
May
|
9 |
43 |
52 |
|
0 |
June |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
53 |
53 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
June
|
9 |
53 |
62 |
|
0 |
July |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
50 |
50 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
July
|
9 |
50 |
59 |
|
0 |
August |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
191 |
191 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
August
|
9 |
191 |
200 |
|
0 |
September |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
210 |
210 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
September
|
9 |
210 |
219 |
|
0 |
October |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
1,347 |
1,347 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
October
|
9 |
1,347 |
1,356 |
|
0 |
November |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
351 |
351 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
November
|
9 |
351 |
360 |
|
0 |
December |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
237 |
237 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
December
|
9 |
237 |
246 |
|
0 |
Annual Total:
2022
|
107 |
3,922 |
4,029 |
|
0 |
2023 |
January |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
1,195 |
1,195 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
January
|
9 |
1,195 |
1,204 |
|
0 |
February |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
200 |
200 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
February
|
9 |
200 |
209 |
|
0 |
March |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
538 |
538 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
March
|
9 |
538 |
547 |
|
0 |
April |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
25 |
25 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
April
|
9 |
25 |
34 |
|
0 |
May |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
212 |
212 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
May
|
9 |
212 |
221 |
|
0 |
June |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
52 |
52 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
June
|
9 |
52 |
61 |
|
0 |
July |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
21 |
21 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
July
|
9 |
21 |
30 |
|
0 |
August |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
37 |
37 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
August
|
9 |
37 |
46 |
|
0 |
September |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
7 |
7 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
September
|
9 |
7 |
16 |
|
0 |
October |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
23 |
23 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
October
|
9 |
23 |
32 |
|
0 |
November |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
41 |
41 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
November
|
9 |
41 |
50 |
|
0 |
December |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
1 |
1 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
December
|
9 |
1 |
10 |
|
0 |
Annual Total:
2023
|
108 |
2,352 |
2,460 |
|
0 |
2024 |
January |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
43 |
43 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
9 |
|
9 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
January
|
9 |
43 |
52 |
|
0 |
Annual Total:
2024
|
9 |
43 |
52 |
|
0 |
Grand Total: |
304 |
7,780 |
8,084 |
|
0 |