| 2026 |
| January |
|
|
219 |
0 |
219 |
Flare |
Minor |
(01/09/2026) Initial C-129 Report Accepted |
|
|
629 |
0 |
629 |
Flare |
Major |
(01/29/2026) Amended C-129 Report Accepted |
|
|
0 |
0 |
0 |
Flare |
Major |
Notification Accepted |
|
|
0 |
0 |
0 |
Flare |
Major |
Notification Accepted |
|
|
0 |
0 |
0 |
Flare |
Major |
Notification Accepted |
|
Monthly Total:
January (5)
|
848 |
0 |
848 |
|
|
Annual Total:
2026 (5)
|
848 |
0 |
848 |
|
| 2025 |
| December |
|
|
51 |
0 |
51 |
Flare |
Minor |
(12/08/2025) Initial C-129 Report Accepted |
|
|
130 |
0 |
130 |
Flare |
Minor |
(12/09/2025) Initial C-129 Report Accepted |
|
|
63 |
0 |
63 |
Flare |
Minor |
(12/11/2025) Amended C-129 Report Accepted |
|
|
84 |
0 |
84 |
Flare |
Minor |
(12/12/2025) Initial C-129 Report Accepted |
|
|
148 |
0 |
148 |
Flare |
Minor |
(12/19/2025) Initial C-129 Report Accepted |
|
|
238 |
0 |
238 |
Flare |
Minor |
(12/23/2025) Initial C-129 Report Accepted |
|
|
199 |
0 |
199 |
Flare |
Minor |
(12/23/2025) Initial C-129 Report Accepted |
|
|
88 |
0 |
88 |
Flare |
Minor |
(12/26/2025) Initial C-129 Report Accepted |
|
|
468 |
0 |
468 |
Flare |
Minor |
(12/26/2025) Initial C-129 Report Accepted |
|
|
241 |
0 |
241 |
Flare |
Minor |
(12/30/2025) Initial C-129 Report Accepted |
|
|
230 |
0 |
230 |
Flare |
Minor |
(12/29/2025) Initial C-129 Report Accepted |
|
|
106 |
0 |
106 |
Flare |
Minor |
(12/29/2025) Initial C-129 Report Accepted |
|
|
187 |
0 |
187 |
Flare |
Minor |
(12/30/2025) Initial C-129 Report Accepted |
|
|
208 |
0 |
208 |
Flare |
Minor |
(12/31/2025) Initial C-129 Report Accepted |
|
|
109 |
0 |
109 |
Flare |
Minor |
(01/02/2026) Initial C-129 Report Accepted |
|
|
155 |
0 |
155 |
Flare |
Minor |
(01/05/2026) Initial C-129 Report Accepted |
|
|
174 |
0 |
174 |
Flare |
Minor |
(01/06/2026) Initial C-129 Report Accepted |
|
|
111 |
0 |
111 |
Flare |
Minor |
(01/06/2026) Initial C-129 Report Accepted |
|
Monthly Total:
December (18)
|
2,990 |
0 |
2,990 |
|
| November |
|
|
51 |
0 |
51 |
Flare |
Minor |
(11/10/2025) Initial C-129 Report Accepted |
|
|
139 |
0 |
139 |
Flare |
Minor |
(11/17/2025) Initial C-129 Report Accepted |
|
|
106 |
0 |
106 |
Flare |
Minor |
(12/01/2025) Initial C-129 Report Accepted |
|
Monthly Total:
November (3)
|
296 |
0 |
296 |
|
| October |
|
|
285 |
0 |
285 |
Flare |
Minor |
(10/08/2025) Initial C-129 Report Accepted |
|
|
102 |
0 |
102 |
Flare |
Minor |
(10/09/2025) Initial C-129 Report Accepted |
|
|
111 |
0 |
111 |
Flare |
Minor |
(10/13/2025) Initial C-129 Report Accepted |
|
|
51 |
0 |
51 |
Flare |
Minor |
(10/13/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(10/14/2025) Initial C-129 Report Accepted |
|
|
109 |
0 |
109 |
Flare |
Minor |
(10/22/2025) Initial C-129 Report Accepted |
|
|
117 |
0 |
117 |
Flare |
Minor |
(10/24/2025) Initial C-129 Report Accepted |
|
|
147 |
0 |
147 |
Flare |
Minor |
(10/27/2025) Initial C-129 Report Accepted |
|
|
73 |
0 |
73 |
Flare |
Minor |
(10/29/2025) Initial C-129 Report Accepted |
|
|
104 |
0 |
104 |
Flare |
Minor |
(10/29/2025) Initial C-129 Report Accepted |
|
Monthly Total:
October (10)
|
1,149 |
0 |
1,149 |
|
| September |
|
|
89 |
0 |
89 |
Flare |
Minor |
(09/09/2025) Initial C-129 Report Accepted |
|
|
51 |
0 |
51 |
Flare |
Minor |
(09/09/2025) Initial C-129 Report Accepted |
|
|
80 |
0 |
80 |
Flare |
Minor |
(09/10/2025) Initial C-129 Report Accepted |
|
|
380 |
0 |
380 |
Flare |
Minor |
(09/10/2025) Initial C-129 Report Accepted |
|
|
370 |
0 |
370 |
Flare |
Minor |
(09/11/2025) Initial C-129 Report Accepted |
|
|
542 |
0 |
542 |
Flare |
Major |
(09/12/2025) Amended C-129 Report Accepted |
|
|
509 |
0 |
509 |
Flare |
Major |
(09/16/2025) Amended C-129 Report Accepted |
|
|
448 |
0 |
448 |
Flare |
Minor |
(09/16/2025) Initial C-129 Report Accepted |
|
|
172 |
0 |
172 |
Flare |
Minor |
(09/16/2025) Initial C-129 Report Accepted |
|
|
154 |
0 |
154 |
Flare |
Minor |
(09/17/2025) Initial C-129 Report Accepted |
|
|
410 |
0 |
410 |
Flare |
Minor |
(09/17/2025) Initial C-129 Report Accepted |
|
|
384 |
0 |
384 |
Flare |
Minor |
(09/18/2025) Initial C-129 Report Accepted |
|
|
295 |
0 |
295 |
Flare |
Minor |
(09/19/2025) Initial C-129 Report Accepted |
|
|
244 |
0 |
244 |
Flare |
Minor |
(09/23/2025) Initial C-129 Report Accepted |
|
|
547 |
0 |
547 |
Flare |
Major |
(09/23/2025) Amended C-129 Report Accepted |
|
|
415 |
0 |
415 |
Flare |
Minor |
(09/24/2025) Initial C-129 Report Accepted |
|
|
943 |
0 |
943 |
Flare |
Major |
(09/24/2025) Amended C-129 Report Accepted |
|
|
340 |
0 |
340 |
Flare |
Minor |
(09/25/2025) Initial C-129 Report Accepted |
|
|
244 |
0 |
244 |
Flare |
Minor |
(09/25/2025) Initial C-129 Report Accepted |
|
|
175 |
0 |
175 |
Flare |
Minor |
(11/10/2025) Cancellation Request Accepted |
|
|
175 |
0 |
175 |
Flare |
Minor |
(09/26/2025) Initial C-129 Report Accepted |
|
|
327 |
0 |
327 |
Flare |
Minor |
(09/30/2025) Initial C-129 Report Accepted |
|
|
591 |
0 |
591 |
Flare |
Major |
(09/30/2025) Amended C-129 Report Accepted |
|
|
113 |
0 |
113 |
Flare |
Minor |
(09/30/2025) Initial C-129 Report Accepted |
|
|
71 |
0 |
71 |
Flare |
Minor |
(10/01/2025) Initial C-129 Report Accepted |
|
|
368 |
0 |
368 |
Flare |
Minor |
(10/02/2025) Initial C-129 Report Accepted |
|
|
248 |
0 |
248 |
Flare |
Minor |
(10/02/2025) Initial C-129 Report Accepted |
|
|
158 |
0 |
158 |
Flare |
Minor |
(10/06/2025) Initial C-129 Report Accepted |
|
Monthly Total:
September (27)
|
8,668 |
0 |
8,668 |
|
| August |
|
|
149 |
0 |
149 |
Flare |
Minor |
(08/06/2025) Initial C-129 Report Accepted |
|
|
76 |
0 |
76 |
Flare |
Minor |
(08/13/2025) Initial C-129 Report Accepted |
|
|
120 |
0 |
120 |
Flare |
Minor |
(08/13/2025) Initial C-129 Report Accepted |
|
|
81 |
0 |
81 |
Flare |
Minor |
(08/13/2025) Initial C-129 Report Accepted |
|
|
105 |
0 |
105 |
Flare |
Minor |
(08/18/2025) Initial C-129 Report Accepted |
|
|
137 |
0 |
137 |
Flare |
Minor |
(08/15/2025) Initial C-129 Report Accepted |
|
|
0 |
0 |
0 |
Flare |
Major |
(08/19/2025) Cancellation Request Accepted |
|
|
927 |
0 |
927 |
Flare |
Major |
(08/19/2025) Initial C-129 Report Accepted |
|
|
164 |
0 |
164 |
Flare |
Minor |
(08/19/2025) Initial C-129 Report Accepted |
|
|
149 |
0 |
149 |
Flare |
Minor |
(08/19/2025) Initial C-129 Report Accepted |
|
|
280 |
0 |
280 |
Flare |
Minor |
(08/20/2025) Initial C-129 Report Accepted |
|
|
277 |
0 |
277 |
Flare |
Minor |
(08/20/2025) Initial C-129 Report Accepted |
|
|
120 |
0 |
120 |
Flare |
Minor |
(08/21/2025) Initial C-129 Report Accepted |
|
|
240 |
0 |
240 |
Flare |
Minor |
(08/21/2025) Initial C-129 Report Accepted |
|
|
102 |
0 |
102 |
Flare |
Minor |
(08/25/2025) Initial C-129 Report Accepted |
|
|
68 |
0 |
68 |
Flare |
Minor |
(08/25/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(08/26/2025) Initial C-129 Report Accepted |
|
|
89 |
0 |
89 |
Flare |
Minor |
(08/26/2025) Initial C-129 Report Accepted |
|
|
127 |
0 |
127 |
Flare |
Minor |
(08/27/2025) Initial C-129 Report Accepted |
|
|
148 |
0 |
148 |
Flare |
Minor |
(08/28/2025) Initial C-129 Report Accepted |
|
|
76 |
0 |
76 |
Flare |
Minor |
(09/04/2025) Initial C-129 Report Accepted |
|
|
96 |
0 |
96 |
Flare |
Minor |
(09/02/2025) Initial C-129 Report Accepted |
|
|
233 |
0 |
233 |
Flare |
Minor |
(09/03/2025) Initial C-129 Report Accepted |
|
|
97 |
0 |
97 |
Flare |
Minor |
(09/04/2025) Initial C-129 Report Accepted |
|
Monthly Total:
August (23)
|
3,911 |
0 |
3,911 |
|
| July |
|
|
131 |
0 |
131 |
Flare |
Minor |
(07/08/2025) Initial C-129 Report Accepted |
|
|
78 |
0 |
78 |
Flare |
Minor |
(07/14/2025) Initial C-129 Report Accepted |
|
|
109 |
0 |
109 |
Flare |
Minor |
(07/15/2025) Initial C-129 Report Accepted |
|
|
181 |
0 |
181 |
Flare |
Minor |
(07/16/2025) Initial C-129 Report Accepted |
|
|
378 |
0 |
378 |
Flare |
Minor |
(07/22/2025) Initial C-129 Report Accepted |
|
|
56 |
0 |
56 |
Flare |
Minor |
(07/22/2025) Initial C-129 Report Accepted |
|
|
71 |
0 |
71 |
Flare |
Minor |
(07/25/2025) Initial C-129 Report Accepted |
|
|
69 |
0 |
69 |
Flare |
Minor |
(07/29/2025) Initial C-129 Report Accepted |
|
|
66 |
0 |
66 |
Flare |
Minor |
(07/29/2025) Initial C-129 Report Accepted |
|
|
219 |
0 |
219 |
Flare |
Minor |
(07/29/2025) Initial C-129 Report Accepted |
|
|
88 |
0 |
88 |
Flare |
Minor |
(09/03/2025) Initial C-129 Report Accepted |
|
|
65 |
0 |
65 |
Flare |
Minor |
(08/05/2025) Initial C-129 Report Accepted |
|
|
58 |
0 |
58 |
Flare |
Minor |
(08/05/2025) Initial C-129 Report Accepted |
|
Monthly Total:
July (13)
|
1,569 |
0 |
1,569 |
|
| June |
|
|
58 |
0 |
58 |
Flare |
Minor |
(06/10/2025) Initial C-129 Report Accepted |
|
|
166 |
0 |
166 |
Flare |
Minor |
(06/16/2025) Initial C-129 Report Accepted |
|
|
183 |
0 |
183 |
Flare |
Minor |
(06/24/2025) Initial C-129 Report Accepted |
|
|
63 |
0 |
63 |
Flare |
Minor |
(06/24/2025) Initial C-129 Report Accepted |
|
|
147 |
0 |
147 |
Flare |
Minor |
(06/30/2025) Initial C-129 Report Accepted |
|
|
69 |
0 |
69 |
Flare |
Minor |
(07/08/2025) Initial C-129 Report Accepted |
|
Monthly Total:
June (6)
|
686 |
0 |
686 |
|
| May |
|
|
52 |
0 |
52 |
Flare |
Minor |
(05/19/2025) Initial C-129 Report Accepted |
|
|
98 |
0 |
98 |
Flare |
Minor |
(05/28/2025) Initial C-129 Report Accepted |
|
|
231 |
0 |
231 |
Flare |
Minor |
(05/28/2025) Initial C-129 Report Accepted |
|
|
368 |
0 |
368 |
Flare |
Minor |
(06/03/2025) Initial C-129 Report Accepted |
|
|
323 |
0 |
323 |
Flare |
Minor |
(06/03/2025) Initial C-129 Report Accepted |
|
Monthly Total:
May (5)
|
1,072 |
0 |
1,072 |
|
| April |
|
|
106 |
0 |
106 |
Flare |
Minor |
(04/21/2025) Initial C-129 Report Accepted |
|
Monthly Total:
April (1)
|
106 |
0 |
106 |
|
| March |
|
|
269 |
0 |
269 |
Flare |
Minor |
(03/07/2025) Initial C-129 Report Accepted |
|
|
260 |
0 |
260 |
Flare |
Minor |
(03/07/2025) Initial C-129 Report Accepted |
|
|
137 |
0 |
137 |
Flare |
Minor |
(03/11/2025) Initial C-129 Report Accepted |
|
|
86 |
0 |
86 |
Flare |
Minor |
(03/11/2025) Initial C-129 Report Accepted |
|
|
94 |
0 |
94 |
Flare |
Minor |
(03/11/2025) Initial C-129 Report Accepted |
|
|
217 |
0 |
217 |
Flare |
Minor |
(03/11/2025) Initial C-129 Report Accepted |
|
|
77 |
0 |
77 |
Flare |
Minor |
(03/21/2025) Initial C-129 Report Accepted |
|
Monthly Total:
March (7)
|
1,140 |
0 |
1,140 |
|
| February |
|
|
68 |
0 |
68 |
Flare |
Minor |
(02/11/2025) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(02/25/2025) Initial C-129 Report Accepted |
|
|
269 |
0 |
269 |
Flare |
Minor |
(03/05/2025) Initial C-129 Report Accepted |
|
|
199 |
0 |
199 |
Flare |
Minor |
(03/06/2025) Initial C-129 Report Accepted |
|
|
105 |
0 |
105 |
Flare |
Minor |
(03/06/2025) Initial C-129 Report Accepted |
|
Monthly Total:
February (5)
|
695 |
0 |
695 |
|
| January |
|
|
110 |
0 |
110 |
Flare |
Minor |
(01/09/2025) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(01/30/2025) Initial C-129 Report Accepted |
|
Monthly Total:
January (2)
|
164 |
0 |
164 |
|
|
Annual Total:
2025 (120)
|
22,446 |
0 |
22,446 |
|
| 2024 |
| December |
|
|
382 |
0 |
382 |
Flare |
Minor |
(12/09/2024) Initial C-129 Report Accepted |
|
|
286 |
0 |
286 |
Flare |
Minor |
(12/09/2024) Initial C-129 Report Accepted |
|
|
215 |
0 |
215 |
Flare |
Minor |
(12/09/2024) Initial C-129 Report Accepted |
|
|
326 |
0 |
326 |
Flare |
Minor |
(12/10/2024) Initial C-129 Report Accepted |
|
|
401 |
0 |
401 |
Flare |
Minor |
(12/11/2024) Initial C-129 Report Accepted |
|
|
283 |
0 |
283 |
Flare |
Minor |
(12/12/2024) Initial C-129 Report Accepted |
|
|
154 |
0 |
154 |
Flare |
Minor |
(12/12/2024) Initial C-129 Report Accepted |
|
|
68 |
0 |
68 |
Flare |
Minor |
(12/17/2024) Initial C-129 Report Accepted |
|
|
78 |
0 |
78 |
Flare |
Minor |
(12/17/2024) Initial C-129 Report Accepted |
|
|
130 |
0 |
130 |
Flare |
Minor |
(12/18/2024) Initial C-129 Report Accepted |
|
|
64 |
0 |
64 |
Flare |
Minor |
(12/24/2024) Initial C-129 Report Accepted |
|
|
98 |
0 |
98 |
Flare |
Minor |
(12/27/2024) Initial C-129 Report Accepted |
|
|
125 |
0 |
125 |
Flare |
Minor |
(12/30/2024) Initial C-129 Report Accepted |
|
|
101 |
0 |
101 |
Flare |
Minor |
(01/07/2025) Initial C-129 Report Accepted |
|
|
62 |
0 |
62 |
Flare |
Minor |
(01/09/2025) Initial C-129 Report Accepted |
|
|
85 |
0 |
85 |
Flare |
Minor |
(01/09/2025) Amended C-129 Report Accepted |
|
Monthly Total:
December (16)
|
2,858 |
0 |
2,858 |
|
| November |
|
|
199 |
0 |
199 |
Flare |
Minor |
(11/06/2024) Initial C-129 Report Accepted |
|
|
419 |
0 |
419 |
Flare |
Minor |
(11/08/2024) Initial C-129 Report Accepted |
|
|
103 |
0 |
103 |
Flare |
Minor |
(11/12/2024) Initial C-129 Report Accepted |
|
|
61 |
0 |
61 |
Flare |
Minor |
(11/12/2024) Initial C-129 Report Accepted |
|
|
61 |
0 |
61 |
Flare |
Minor |
(11/14/2024) Initial C-129 Report Accepted |
|
|
105 |
0 |
105 |
Flare |
Minor |
(11/14/2024) Initial C-129 Report Accepted |
|
|
134 |
0 |
134 |
Flare |
Minor |
(11/19/2024) Initial C-129 Report Accepted |
|
|
117 |
0 |
117 |
Flare |
Minor |
(11/20/2024) Initial C-129 Report Accepted |
|
|
116 |
0 |
116 |
Flare |
Minor |
(11/20/2024) Initial C-129 Report Accepted |
|
|
110 |
0 |
110 |
Flare |
Minor |
(11/20/2024) Initial C-129 Report Accepted |
|
|
55 |
0 |
55 |
Flare |
Minor |
(11/25/2024) Initial C-129 Report Accepted |
|
|
114 |
0 |
114 |
Flare |
Minor |
(11/25/2024) Initial C-129 Report Accepted |
|
|
112 |
0 |
112 |
Flare |
Minor |
(12/03/2024) Initial C-129 Report Accepted |
|
|
149 |
0 |
149 |
Flare |
Minor |
(12/03/2024) Initial C-129 Report Accepted |
|
|
114 |
0 |
114 |
Flare |
Minor |
(12/03/2024) Initial C-129 Report Accepted |
|
|
58 |
0 |
58 |
Flare |
Minor |
(12/04/2024) Initial C-129 Report Accepted |
|
|
115 |
0 |
115 |
Flare |
Minor |
(12/05/2024) Initial C-129 Report Accepted |
|
Monthly Total:
November (17)
|
2,142 |
0 |
2,142 |
|
| October |
|
|
160 |
0 |
160 |
Flare |
Minor |
(10/08/2024) Initial C-129 Report Accepted |
|
|
57 |
0 |
57 |
Flare |
Minor |
(10/08/2024) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(10/08/2024) Initial C-129 Report Accepted |
|
|
125 |
0 |
125 |
Flare |
Minor |
(10/23/2024) Initial C-129 Report Accepted |
|
|
180 |
0 |
180 |
Flare |
Minor |
(10/23/2024) Amended C-129 Report Accepted |
|
|
165 |
0 |
165 |
Flare |
Minor |
(10/25/2024) Initial C-129 Report Accepted |
|
|
225 |
0 |
225 |
Flare |
Minor |
(10/28/2024) Initial C-129 Report Accepted |
|
|
67 |
0 |
67 |
Flare |
Minor |
(10/28/2024) Initial C-129 Report Accepted |
|
|
67 |
0 |
67 |
Flare |
Minor |
(10/29/2024) Initial C-129 Report Accepted |
|
|
149 |
0 |
149 |
Flare |
Minor |
(10/29/2024) Initial C-129 Report Accepted |
|
|
176 |
0 |
176 |
Flare |
Minor |
(10/29/2024) Initial C-129 Report Accepted |
|
|
140 |
0 |
140 |
Flare |
Minor |
(10/30/2024) Initial C-129 Report Accepted |
|
|
74 |
0 |
74 |
Flare |
Minor |
(10/30/2024) Initial C-129 Report Accepted |
|
|
75 |
0 |
75 |
Flare |
Minor |
(10/31/2024) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(10/31/2024) Initial C-129 Report Accepted |
|
|
292 |
0 |
292 |
Flare |
Minor |
(11/04/2024) Initial C-129 Report Accepted |
|
Monthly Total:
October (16)
|
2,060 |
0 |
2,060 |
|
| September |
|
|
102 |
0 |
102 |
Flare |
Minor |
(09/12/2024) Initial C-129 Report Accepted |
|
|
62 |
0 |
62 |
Flare |
Minor |
(09/16/2024) Initial C-129 Report Accepted |
|
|
59 |
0 |
59 |
Flare |
Minor |
(09/17/2024) Initial C-129 Report Accepted |
|
|
65 |
0 |
65 |
Flare |
Minor |
(09/24/2024) Initial C-129 Report Accepted |
|
|
65 |
0 |
65 |
Flare |
Minor |
(10/01/2024) Initial C-129 Report Accepted |
|
Monthly Total:
September (5)
|
353 |
0 |
353 |
|
| August |
|
|
98 |
0 |
98 |
Flare |
Minor |
(08/13/2024) Initial C-129 Report Accepted |
|
|
94 |
0 |
94 |
Flare |
Minor |
(08/14/2024) Initial C-129 Report Accepted |
|
|
91 |
0 |
91 |
Flare |
Minor |
(08/15/2024) Initial C-129 Report Accepted |
|
|
184 |
0 |
184 |
Flare |
Minor |
(08/16/2024) Initial C-129 Report Accepted |
|
|
80 |
0 |
80 |
Flare |
Minor |
(08/16/2024) Initial C-129 Report Accepted |
|
|
100 |
0 |
100 |
Flare |
Minor |
(08/23/2024) Initial C-129 Report Accepted |
|
|
62 |
0 |
62 |
Flare |
Minor |
(08/23/2024) Initial C-129 Report Accepted |
|
|
75 |
0 |
75 |
Flare |
Minor |
(08/27/2024) Initial C-129 Report Accepted |
|
|
64 |
0 |
64 |
Flare |
Minor |
(09/03/2024) Initial C-129 Report Accepted |
|
|
90 |
0 |
90 |
Flare |
Minor |
(09/03/2024) Initial C-129 Report Accepted |
|
Monthly Total:
August (10)
|
938 |
0 |
938 |
|
| July |
|
|
179 |
0 |
179 |
Flare |
Minor |
(07/09/2024) Initial C-129 Report Accepted |
|
|
462 |
0 |
462 |
Flare |
Minor |
(07/10/2024) Initial C-129 Report Accepted |
|
|
150 |
0 |
150 |
Flare |
Minor |
(07/10/2024) Initial C-129 Report Accepted |
|
|
0 |
0 |
0 |
Flare |
Major |
(07/09/2024) Cancellation Request Accepted |
|
|
468 |
0 |
468 |
Flare |
Minor |
(07/23/2024) Initial C-129 Report Accepted |
|
|
614 |
0 |
614 |
Flare |
Major |
(07/22/2024) Initial C-129 Report Accepted |
|
|
255 |
0 |
255 |
Flare |
Minor |
(07/24/2024) Initial C-129 Report Accepted |
|
|
91 |
0 |
91 |
Flare |
Minor |
(07/25/2024) Initial C-129 Report Accepted |
|
|
99 |
0 |
99 |
Flare |
Minor |
(07/30/2024) Initial C-129 Report Accepted |
|
|
166 |
0 |
166 |
Flare |
Minor |
(07/30/2024) Initial C-129 Report Accepted |
|
|
214 |
0 |
214 |
Flare |
Minor |
(07/30/2024) Initial C-129 Report Accepted |
|
|
178 |
0 |
178 |
Flare |
Minor |
(07/31/2024) Initial C-129 Report Accepted |
|
|
83 |
0 |
83 |
Flare |
Minor |
(08/01/2024) Initial C-129 Report Accepted |
|
|
93 |
0 |
93 |
Flare |
Minor |
(08/01/2024) Initial C-129 Report Accepted |
|
|
94 |
0 |
94 |
Flare |
Minor |
(08/05/2024) Initial C-129 Report Accepted |
|
|
102 |
0 |
102 |
Flare |
Minor |
(08/07/2024) Initial C-129 Report Accepted |
|
|
123 |
0 |
123 |
Flare |
Minor |
(08/08/2024) Initial C-129 Report Accepted |
|
Monthly Total:
July (16)
|
3,371 |
0 |
3,371 |
|
|
Annual Total:
2024 (80)
|
11,722 |
0 |
11,722 |
|
| Grand Total: |
35,016 |
0 |
35,016 |
|