FOY1805031625 EOG CHILI PEPPER RECYCLING FACILITY & CONTAINMENT @ C-17-23S-35E 0N 0E

General Facility Information
[7377] EOG RESOURCES INC
Active
Request to Open Accepted, Pending submission of Monthly/Annual reporting from the operator as required
Recycling Facility - (RFL)

Surface Location: C-17-23S-35E 0 FNL 0 FEL
Lat/Long:32.30994,-103.392206 NAD83

Hobbs
Private
Lea (25)


Ground Water (GW) Details

0
0
No



Notes

Option 1; 1 containment: 1 million bbls capacity


Facility Dates

Type Action Effective Received Denied Approved
Commencement of Operations Notice 02/19/2018 02/19/2018
Site Registration 01/16/2018 01/16/2018

Events

Date Detail
01/16/2026 Operator clarification: "There was an update in our system at the end of June that apparently threw everything off. Our system wasn’t flagging these for us as incomplete when they were originally conducted. When our guys did the inspection, if they didn’t click completed it didn’t save them as completed. We have had to go in and manually complete each one of these which is what the completed date is showing. I’m not sure why the inspections are saved all out of order. I tried filtering it so that it would sort by the scheduled date, but I don’t have that option. July inspections can be found on pages 23, 27, 30 and 34. August inspections can be found on pages 14, 15, 16, and 22. October inspections can be found on pages 9, 10, 11, and 12. November inspections can be found on pages 5, 6, 7, and 8. I have text receipts showing dates when our guys conducted inspections. Let me know what other information is needed. I apologize for this mess."
History
Effective On Name Operator Status Effective Until
02/19/2018 EOG CHILI PEPPER RECYCLING FACILITY & CONTAINMENT [7377] EOG RESOURCES INC

Pits & Containments
Id Name Rule Status (Capacity) Type Registration
Inspection
Before *
Earliest Effective
Commencement
Last Effective
Cessation
Inspection
After *
Closure
Report
Reclamation
Report
Restoration
Complete
yVV2524835061 1900 AROA RCON @ FOY1805031625
34
Active
(1000000 bbl) RCON
01/16/2018 02/19/2018




Recycled Liquid Oil Field Waste

The recycled liquid oil field waste volumes are sourced from recycled liquid oil field waste reports (C-148) submissions.

Collapse All Recycled Liquid Oil Field Waste 12/2025 01/2026
Operational Capacity (bbl) Opening Level (bbl) Produced Water Received (bbl) Other Fluids Received (bbl) Oil Skimmed (bbl) Volume Leaving Facility (bbl) Closing Level (bbl)
2025
yVV2524835061 (RCON)
December 1,000,000 751,353 0 0 NONE 0 14,920 736,433
Structure Total: 0 0 0 14,920
Annual Total: 0 0 0 14,920
2026
yVV2524835061 (RCON)
January 1,000,000 736,433 0 0 NONE 0 79,481 656,952
Structure Total: 0 0 0 79,481
Annual Total: 0 0 0 79,481
Grand Total: 0 0 0 94,401

Orders

1RF-26-0

images

Applicant:[7377] EOG RESOURCES INC

Contact: Dustin Kinder
Reviewer:Olivia Yu
Approved By:
Issuing Office:Hobbs

Processing Dates

Received:01/16/2018
Approved:02/19/2018
Expiration:01/16/2023
Ordered:02/19/2018
Denied:
Cancelled:


Inspections No Inspections Found

Financial Assurance
Effective Base Balance Issuer Cash/Surety Bond Type Cancellation Date
Requests to release bonds must be submitted in writing. You may send an e-mail to OCD.AdminComp@emnrd.nm.gov.

Click to go back to top of page