FSL1934534776 BEU DI 5 RECYCLING CONTAINMENT FACILITY @ C-27-20S-31E 0N 0E

General Facility Information
[373075] XTO PERMIAN OPERATING LLC.
Active
Request to Open Accepted, Pending submission of Monthly/Annual reporting from the operator as required
Recycling Facility - (RFL)

Surface Location: C-27-20S-31ELot: 2, 0 FNL 0 FEL
Lat/Long:32.5481855,-103.8589454 NAD83

Artesia
Federal
Eddy (15)


Ground Water (GW) Details

0
No



Notes



Facility Dates

Type Action Effective Received Denied Approved
Commencement of Operations Notice 12/11/2019 12/11/2019
Site Registration 03/15/2019 12/11/2019

Events

No events Found

History
Effective On Name Operator Status Effective Until
12/11/2019 BEU DI 5 RECYCLING CONTAINMENT FACILITY [373075] XTO PERMIAN OPERATING LLC.

Pits & Containments
Id Name Rule Status (Capacity) Type Registration
Inspection
Before *
Earliest Effective
Commencement
Last Effective
Cessation
Inspection
After *
Closure
Report
Reclamation
Report
Restoration
Complete
ycon1907450281 1900 AROA RCON @ FSL1934534776
34
Active
(500000 bbl) RCON
03/15/2019 12/11/2019
YCON1907450282 1900 AROA RCON @ FSL1934534776
34
Active
(500000 bbl) RCON
03/15/2019 12/11/2019




Recycled Liquid Oil Field Waste

The recycled liquid oil field waste volumes are sourced from recycled liquid oil field waste reports (C-148) submissions.

Collapse All Recycled Liquid Oil Field Waste 11/2025 05/2026
Operational Capacity (bbl) Opening Level (bbl) Produced Water Received (bbl) Other Fluids Received (bbl) Oil Skimmed (bbl) Volume Leaving Facility (bbl) Closing Level (bbl)
2025
ycon1907450281 (RCON)
November 500,000 0 319,256 Pond starting Liquid level. 0 0 319,256
December 500,000 319,256 0 0 0 0 319,256
Structure Total: 0 319,256 0 0
YCON1907450282 (RCON)
November 500,000 4,854,051 140,605 Pond starting Liquid level. 0 4,610,250 384,406
December 500,000 384,406 733,890 0 0 744,241 374,055
Structure Total: 5,587,941 140,605 0 5,354,491
Annual Total: 5,587,941 459,861 0 5,354,491
2026
ycon1907450281 (RCON)
January 500,000 319,256 54,799 0 0 0 374,055
February 500,000 374,055 0 0 0 202,631 171,424
March 500,000 171,424 0 0 0 0 171,424
April 500,000 171,424 0 0 0 0 171,424
May 500,000 171,424 0 0 0 83,369 88,055
Structure Total: 54,799 0 0 286,000
YCON1907450282 (RCON)
January 500,000 374,055 83,687 0 0 0 457,742
February 500,000 457,742 1,974,160 0 0 1,946,012 485,890
March 500,000 485,890 1,057,328 0 0 1,341,639 201,579
April 500,000 201,579 1,201,617 0 0 1,114,256 288,940
May 500,000 288,940 1,003,352 0 0 1,178,456 113,836
Structure Total: 5,320,144 0 0 5,580,363
Annual Total: 5,374,943 0 0 5,866,363
Grand Total: 10,962,884 459,861 0 11,220,854

Orders

2RF-145-0

images

Applicant:[373075] XTO PERMIAN OPERATING LLC.

Contact:Stephanie Rabadue
Reviewer:Bradford Billings
Approved By:
Issuing Office:Santa Fe

Processing Dates

Received:03/15/2019
Approved:
Expiration:03/15/2024
Ordered:12/11/2019
Denied:
Cancelled:


Inspections No Inspections Found

Financial Assurance
Effective Base Balance Issuer Cash/Surety Bond Type Cancellation Date
Requests to release bonds must be submitted in writing. You may send an e-mail to OCD.AdminComp@emnrd.nm.gov.

Click to go back to top of page