OCD Permitting

nAB1526040000 FITZ COMPRESSOR STATION

General Incident Information

[fAB1526039763] Fitz Compressor Station
[36785] DCP OPERATING COMPANY, LP
Inactive
Incident Closure Approved
Natural Gas Release

J-34-19S-29E      0 FNL      0 FEL
32.61711,-104.05931 NAD83
Artesia
Federal
Eddy (15)


Severity Indicators














Notes

Industry Rep
Referred to Environmental Inspector


Contact Details


Event Dates

08/30/2015

9/14/2015

11/30/2015  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Remediation Closure Report 09/17/2015

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Other Pipeline (Any) [OBSOLETE] Natural Gas (Methane) 1805 0 1805 Mcf
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
09/17/2015 2RP-3258 C-141 received 9/14/2015 for release on 8/30/2015. Cause listed as, "Natural gas release to atmosphere or through flare due to startup, shutdown, maintenance, or malfunction of gas processing equipment."

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No
From paragraph A. Major release determine using:
        (3) an unauthorized release of gases exceeding 500 MCF.

Incident Corrective Actions
No initial response data was found for this incident.

No site characterization data was found for this incident.

No remediation plan data was found for this incident.

No active remediation deferral request was found for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders
images

2RP-3258-0

[36785] DCP OPERATING COMPANY, LP
Nicholas L. Case
LWB

Artesia

Processing Dates


09/17/2015

09/17/2015

09/17/2015

Facility Details

[fAB1526039763] Fitz Compressor Station
Compressor Station - (CS)
J-34-19S-29E
[36785] DCP OPERATING COMPANY, LP
0
0

Closure Not Accepted, Pending submission of Monthly/Annual reporting from the operator



Click to go back to top of page