FAB1526039763 FITZ COMPRESSOR STATION @ J-34-19S-29E

General Facility Information
[36785] DCP OPERATING COMPANY, LP
Active
Closure Not Accepted, Pending submission of Monthly/Annual reporting from the operator
Compressor Station - (CS)

J-34-19S-29E      0 FL      0 FL
32.617100001,-104.059300001
Artesia
Federal
Eddy (15)


Ground Water (GW) Details

0
0
No



Notes



Facility Dates

Type Action Effective Received Denied Approved
Commencement of Operations Notice 09/17/2015 09/17/2015

Events

No events Found

History
Effective On Name Operator Status Effective Until
09/17/2015 Fitz Compressor Station [36785] DCP OPERATING COMPANY, LP

Pits & Containments No Pits Found
Id Name Rule Status (Capacity) Type Registration
Inspection
Before *
Earliest Effective
Commencement
Last Effective
Cessation
Inspection
After *
Closure
Report
Reclamation
Report
Restoration
Complete
Reported Releases

The reported release volumes are sourced from C-141 submissions.

Hide All Reported Releases 06/10/2004 08/30/2015
   Release Volumes Additional Details
  BBLS LBS MCF UNK Type Product Severity Status
2015
August
nAB1526040000   (08/30/2015)
0 0 1,805 0 Natural Gas Release
NATG
Major (09/17/2015)   Incident Closure Approved
Monthly Total: 0 0 1,805 0  
Annual Total: 0 0 1,805 0  
2004
June
nEEM0416638700   (06/10/2004)
0 0 33 0 Natural Gas Release
NATG
Re-vegetation Report Approved
nEEM0416924131   (06/14/2004)
0 0 86 0 Natural Gas Release
NATG
Minor Re-vegetation Report Approved
nEEM0417546520   (06/21/2004)
0 0 49 0 Natural Gas Release
NATG
Re-vegetation Report Approved
nEEM0417635671   (06/23/2004)
0 0 67 0 Natural Gas Release
NATG
Minor Re-vegetation Report Approved
Monthly Total: 0 0 235 0  
Annual Total: 0 0 235 0  
Grand Total: 0 0 2,040 0  

Reported Venting & Flaring

The reported venting & flaring volumes are sourced from C-129 submissions.

Hide All Reported Venting & Flaring 03/07/2022 01/28/2026
   Venting & Flaring Volumes Additional Details
  Flared (MCF) Vented (MCF) Total (MCF) Type Severity Status
2026
January
nAPP2602641098   (01/25/2026)
0 108 108 Vent Minor (01/26/2026)   Initial C-129 Report Accepted
nAPP2602729521   (01/26/2026)
0 493 493 Vent Minor (01/27/2026)   Initial C-129 Report Accepted
nAPP2602833106   (01/27/2026)
0 596 596 Vent Major (01/28/2026)   Initial C-129 Report Accepted
nAPP2602936701   (01/28/2026)
0 118 118 Vent Minor (01/29/2026)   Initial C-129 Report Accepted
Monthly Total: 0 1,315 1,315  
Annual Total: 0 1,315 1,315  
2025
March
nAPP2508526590   (03/25/2025)
0 53 53 Vent Minor (03/26/2025)   Initial C-129 Report Accepted
Monthly Total: 0 53 53  
January
nAPP2502142722   (01/20/2025)
0 224 224 Vent Minor (01/21/2025)   Initial C-129 Report Accepted
Monthly Total: 0 224 224  
Annual Total: 0 277 277  
2024
July
nAPP2419035690   (07/06/2024)
0 569 569 Vent Major (07/08/2024)   Initial C-129 Report Accepted
Monthly Total: 0 569 569  
March
nAPP2407424683   (03/13/2024)
0 166 166 Vent Minor (03/14/2024)   Initial C-129 Report Accepted
Monthly Total: 0 166 166  
Annual Total: 0 735 735  
2023
June
nAPP2317729890   (06/23/2023)
0 180 180 Vent Minor (06/26/2023)   Initial C-129 Report Accepted
Monthly Total: 0 180 180  
Annual Total: 0 180 180  
2022
July
nAPP2221042262   (07/28/2022)
0 109 109 Vent Minor (07/29/2022)   Initial C-129 Report Accepted
Monthly Total: 0 109 109  
March
nAPP2206737695   (03/07/2022)
0 78 78 Vent Minor (03/08/2022)   Initial C-129 Report Accepted
Monthly Total: 0 78 78  
Annual Total: 0 187 187  
Grand Total: 0 2,694 2,694  

Upstream Natural Gas Venting & Flaring

The upstream natural gas venting & flaring volumes are sourced from upstream natural gas waste reports (C-115B) submissions.

Hide All Upstream Venting & Flaring 01/2022 01/2022
   Venting & Flaring Volumes Beneficial Use
Vented (MCF) Flared (MCF) Total (MCF) Used (MCF)
2022
January (second required quarterly report)
Emergency 122 0 122 Power generation on lease 0
Non-Scheduled Maintenance or Malfunction 0 0 0 Power generation for grid 0
Routine Repair and Maintenance 0 0 0 Compression on lease 0
Routine Downhole Maintenance 0 0 0 Liquids removal on lease 0
Manual Liquid Unloading 0 0 0 Reinjection for underground storage 0
Storage Tanks 0 0 0 Reinjection for temporary storage 0
Insufficient Availability or Capacity 0 0 0 Reinjection for enhanced oil recovery 0
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) 0 0 0 Fuel cell production 0
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps 0 0 Other alternative beneficial uses approved by the division 0
Improperly Closed or Maintained Thief Hatch 0 0 Equipment Fuel Gas 0
Venting or Flaring in Excess of Eight Hours 0 0 0 Flare, Combustor or Incinerator pilot fuel 0
Venting And Flaring From An Exploratory Well 0 0 0
Other Surface Waste 0 0 0
Natural Gas Not Suitable for Transportation or Processing (O2) 0 0 0
Report Total: 122 0 122 0
Annual Total: 122 0 122 0
Grand Total: 122 0 122 0



Orders
images

2RP-3258-0

[36785] DCP OPERATING COMPANY, LP
Nicholas L. Case
LWB

Artesia

Processing Dates


09/17/2015

09/17/2015

09/17/2015




Inspections No Inspections Found

Financial Assurance
Effective Base Balance Issuer Cash/Surety Bond Type Cancellation Date
Requests to release bonds must be submitted in writing. You may send an e-mail to OCD.AdminComp@emnrd.nm.gov.