| 07/26/2023 |
Incident cancelled by the operator, upon the submission of a [C-129] Cancel Venting and/or Flaring (C-129C) report. |
| 07/26/2023 |
The (07/26/2023, C-129C) application [244584] was assigned to this incident. |
| 01/09/2023 |
Corrective actions provided by the operator: False meter entry. |
| 01/09/2023 |
Steps taken to prevent waste provided by the operator: False meter entry. |
| 01/09/2023 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 01/09/2023 |
The (01/09/2023, C-129A) application [174215] was assigned to this incident. |
| 11/09/2022 |
The (11/09/2022, C-129) application [157280] was assigned to this incident. |
| 11/09/2022 |
Corrective actions provided by the operator: Notified DCP. |
| 11/09/2022 |
Steps taken to prevent waste provided by the operator: Choked wells back. |
| 11/09/2022 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 11/03/2022 |
The flaring of natural gas discovered by the operator. |