| 08/12/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 08/12/2025 |
The (08/12/2025, C-129A) application [494900] was assigned to this incident. |
| 05/12/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 05/12/2025 |
The (05/12/2025, C-129A) application [460843] was assigned to this incident. |
| 03/05/2025 |
The (03/05/2025, C-129) application [439040] was assigned to this incident. |
| 03/05/2025 |
Corrective actions provided by the operator: Contacted 3rd party to determine when line pressure will decrease. |
| 03/05/2025 |
Steps taken to prevent waste provided by the operator: Flaring stops when line pressure drops. |
| 03/05/2025 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 03/03/2025 |
The flaring of natural gas discovered by the operator. |