OCD Permitting

FEEM0416235819 GRAYBURG BOOSTER STATION @ -18-17S-30E

General Facility Information
[36785] DCP OPERATING COMPANY, LP
Active
Closure Not Accepted, Pending submission of Monthly/Annual reporting from the operator
Compressor Station - (CS)

-18-17S-30E      0 FL      0 FL

Artesia
Eddy (15)


Ground Water (GW) Details

0
0
No



Notes



Facility Dates

Type Action Effective Received Denied Approved
Commencement of Operations Notice 09/19/2025

Events

No events Found

History
Effective On Name Operator Status Effective Until
Grayburg Booster Station [36785] DCP OPERATING COMPANY, LP

Pits & Containments No Pits Found
Id Name Rule Status (Capacity) Type Registration
Inspection
Before *
Earliest Effective
Commencement
Last Effective
Cessation
Inspection
After *
Closure
Report
Reclamation
Report
Restoration
Complete
Reported Releases

The reported release volumes are sourced from C-141 submissions.

Hide All Reported Releases 06/06/2004 06/19/2004
   Release Volumes Additional Details
  BBLS LBS MCF UNK Type Product Severity Status
2004
June
nEEM0416252461   (06/06/2004)
0 0 26 0 Natural Gas Release
NATG
Re-vegetation Report Approved
nEEM0416255233   (06/08/2004)
0 0 210 0 Natural Gas Release
NATG
Minor Re-vegetation Report Approved
nEEM0416924502   (06/09/2004)
0 0 75 0 Natural Gas Release
NATG
Minor Re-vegetation Report Approved
nEEM0416639410   (06/10/2004)
0 0 797 0 Natural Gas Release
MERC
Major Re-vegetation Report Approved
nEEM0416926488   (06/11/2004)
0 0 759 0 Natural Gas Release
NATG
Major Re-vegetation Report Approved
nEEM0416926243   (06/12/2004)
0 0 315 0 Natural Gas Release
NATG
Minor Re-vegetation Report Approved
nEEM0416925342   (06/13/2004)
0 0 50 0 Natural Gas Release
NATG
Re-vegetation Report Approved
nEEM0417426346   (06/16/2004)
0 0 498 0 Natural Gas Release
NATG
Minor Re-vegetation Report Approved
nEEM0417427041   (06/19/2004)
0 0 2,698 0 Natural Gas Release
NATG
Major Re-vegetation Report Approved
Monthly Total: 0 0 5,428 0  
Annual Total: 0 0 5,428 0  
Grand Total: 0 0 5,428 0  

Reported Venting & Flaring

The reported venting & flaring volumes are sourced from C-129 submissions.

Hide All Reported Venting & Flaring 01/02/2022 01/28/2026
   Venting & Flaring Volumes Additional Details
  Flared (MCF) Vented (MCF) Total (MCF) Type Severity Status
2026
January
nAPP2602958498   (01/28/2026)
0 59 59 Vent Minor (01/29/2026)   Initial C-129 Report Accepted
Monthly Total: 0 59 59  
Annual Total: 0 59 59  
2024
June
nAPP2416229850   (06/07/2024)
0 345 345 Vent Minor (06/10/2024)   Initial C-129 Report Accepted
Monthly Total: 0 345 345  
January
nAPP2402330749   (01/22/2024)
0 109 109 Vent Minor (01/23/2024)   Initial C-129 Report Accepted
Monthly Total: 0 109 109  
Annual Total: 0 454 454  
2022
February
nAPP2204532261   (02/11/2022)
0 84 84 Vent Minor (02/14/2022)   Initial C-129 Report Accepted
Monthly Total: 0 84 84  
January
nAPP2200440480   (01/02/2022)
252 0 252 Flare Minor (01/04/2022)   Initial C-129 Report Accepted
Monthly Total: 252 0 252  
Annual Total: 252 84 336  
Grand Total: 252 597 849  

Upstream Natural Gas Venting & Flaring

The upstream natural gas venting & flaring volumes are sourced from upstream natural gas waste reports (C-115B) submissions.

Hide All Upstream Venting & Flaring 01/2022 01/2022
   Venting & Flaring Volumes Beneficial Use
Vented (MCF) Flared (MCF) Total (MCF) Used (MCF)
2022
January (second required quarterly report)
Emergency 84 259 343 Power generation on lease 0
Non-Scheduled Maintenance or Malfunction 0 0 0 Power generation for grid 0
Routine Repair and Maintenance 0 0 0 Compression on lease 0
Routine Downhole Maintenance 0 0 0 Liquids removal on lease 0
Manual Liquid Unloading 0 0 0 Reinjection for underground storage 0
Storage Tanks 0 0 0 Reinjection for temporary storage 0
Insufficient Availability or Capacity 0 0 0 Reinjection for enhanced oil recovery 0
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) 0 0 0 Fuel cell production 0
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps 0 0 Other alternative beneficial uses approved by the division 0
Improperly Closed or Maintained Thief Hatch 0 0 Equipment Fuel Gas 0
Venting or Flaring in Excess of Eight Hours 0 0 0 Flare, Combustor or Incinerator pilot fuel 0
Venting And Flaring From An Exploratory Well 0 0 0
Other Surface Waste 0 0 0
Natural Gas Not Suitable for Transportation or Processing (O2) 0 0 0
Report Total: 84 259 343 0
Annual Total: 84 259 343 0
Grand Total: 84 259 343 0



Orders No Orders Found


Inspections No Inspections Found

Financial Assurance
Effective Base Balance Issuer Cash/Surety Bond Type Cancellation Date
Requests to release bonds must be submitted in writing. You may send an e-mail to OCD.AdminComp@emnrd.nm.gov.

Click to go back to top of page