2021 |
October (first required quarterly report) |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
150 |
150 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
135 |
|
135 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
100 |
|
100 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
October (first required quarterly report)
|
235 |
150 |
385 |
|
0 |
Annual Total:
2021
|
235 |
150 |
385 |
|
0 |
2022 |
January (second required quarterly report) |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
244 |
244 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
83 |
0 |
83 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
131 |
131 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
15 |
|
15 |
Other alternative beneficial uses approved by the division |
50 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
January (second required quarterly report)
|
98 |
375 |
473 |
|
50 |
April |
Emergency |
0 |
0 |
0 |
Power generation on lease |
60 |
Non-Scheduled Maintenance or Malfunction |
0 |
75 |
75 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
April
|
0 |
75 |
75 |
|
60 |
May |
Emergency |
0 |
0 |
0 |
Power generation on lease |
60 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
May
|
0 |
0 |
0 |
|
60 |
June |
Emergency |
0 |
0 |
0 |
Power generation on lease |
60 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
June
|
0 |
0 |
0 |
|
60 |
July |
Emergency |
0 |
0 |
0 |
Power generation on lease |
60 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
300 |
300 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
July
|
0 |
300 |
300 |
|
60 |
August |
Emergency |
0 |
0 |
0 |
Power generation on lease |
60 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
60 |
60 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
0 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
August
|
0 |
60 |
60 |
|
60 |
September |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
September
|
0 |
0 |
0 |
|
60 |
October |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
October
|
0 |
0 |
0 |
|
60 |
November |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
November
|
0 |
0 |
0 |
|
60 |
December |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
150 |
150 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
December
|
0 |
150 |
150 |
|
60 |
Annual Total:
2022
|
98 |
960 |
1,058 |
|
590 |
2023 |
January |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
45 |
45 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
January
|
0 |
45 |
45 |
|
60 |
February |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
February
|
0 |
0 |
0 |
|
60 |
March |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
March
|
0 |
0 |
0 |
|
45 |
April |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
April
|
0 |
0 |
0 |
|
45 |
May |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
May
|
0 |
0 |
0 |
|
45 |
June |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
June
|
0 |
0 |
0 |
|
45 |
July |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
July
|
0 |
0 |
0 |
|
45 |
August |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
August
|
0 |
0 |
0 |
|
45 |
September |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
September
|
0 |
0 |
0 |
|
45 |
October |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
October
|
0 |
0 |
0 |
|
45 |
November |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
November
|
0 |
0 |
0 |
|
45 |
December |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
December
|
0 |
0 |
0 |
|
45 |
Annual Total:
2023
|
0 |
45 |
45 |
|
570 |
2024 |
January |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
January
|
0 |
0 |
0 |
|
45 |
February |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
February
|
0 |
0 |
0 |
|
45 |
March |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
March
|
0 |
0 |
0 |
|
45 |
April |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
April
|
0 |
0 |
0 |
|
45 |
May |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
May
|
0 |
0 |
0 |
|
45 |
June |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
June
|
0 |
0 |
0 |
|
45 |
July |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
July
|
0 |
0 |
0 |
|
45 |
August |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
0 |
0 |
0 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
45 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
August
|
0 |
0 |
0 |
|
45 |
September |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
3 |
0 |
3 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
September
|
3 |
0 |
3 |
|
60 |
October |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
3 |
0 |
3 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
October
|
3 |
0 |
3 |
|
60 |
November |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
3 |
0 |
3 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
60 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
November
|
3 |
0 |
3 |
|
60 |
December |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
3 |
0 |
3 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
62 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
December
|
3 |
0 |
3 |
|
62 |
Annual Total:
2024
|
12 |
0 |
12 |
|
602 |
2025 |
January |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
3 |
0 |
3 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
62 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
January
|
3 |
0 |
3 |
|
62 |
February |
Emergency |
0 |
0 |
0 |
Power generation on lease |
0 |
Non-Scheduled Maintenance or Malfunction |
0 |
0 |
0 |
Power generation for grid |
0 |
Routine Repair and Maintenance |
0 |
0 |
0 |
Compression on lease |
0 |
Routine Downhole Maintenance |
0 |
0 |
0 |
Liquids removal on lease |
0 |
Manual Liquid Unloading |
0 |
0 |
0 |
Reinjection for underground storage |
0 |
Storage Tanks |
3 |
0 |
3 |
Reinjection for temporary storage |
0 |
Insufficient Availability or Capacity |
0 |
0 |
0 |
Reinjection for enhanced oil recovery |
0 |
Natural Gas Not Suitable for Transportation or Processing (N2, H2S, or CO2) |
0 |
0 |
0 |
Fuel cell production |
0 |
Venting as Result of Normal Operation of Pneumatic Controllers and Pumps |
0 |
|
0 |
Other alternative beneficial uses approved by the division |
0 |
Improperly Closed or Maintained Thief Hatch |
0 |
|
0 |
Equipment Fuel Gas |
0 |
Venting or Flaring in Excess of Eight Hours |
0 |
0 |
0 |
Flare, Combustor or Incinerator pilot fuel |
46 |
Venting And Flaring From An Exploratory Well |
0 |
0 |
0 |
|
|
Other Surface Waste |
0 |
0 |
0 |
|
|
Natural Gas Not Suitable for Transportation or Processing (O2) |
0 |
0 |
0 |
|
|
Report Total:
February
|
3 |
0 |
3 |
|
46 |
Annual Total:
2025
|
6 |
0 |
6 |
|
108 |
Grand Total: |
351 |
1,155 |
1,506 |
|
1,870 |